Laberge Group

Village of Kiryas Joel – Street and Sidewalk Improvement

Laberge Group was retained by the Village of Kiryas Joel to design and implement an extensive street and sidewalk improvement project on several heavily traveled roads. This comprehensive undertaking will include widening and replacing sidewalks and curbs, and widening roadways. The effected roads and pedestrian ways are located along the perimeter of the central shopping […]

Village of Kiryas Joel – Street and Sidewalk Improvement Read More »

Town of Brunswick – Van Derheyden Dam Reconstruction and Improvements

Laberge Group was retained by the Town of Brunswick to provide design and reconstruction services to address safety and compliance issues at the Van Derhyden Dam. Cognizant of the budgetary restrictions of the Town, Laberge Group has prioritized the delivery of cost-effective solutions. In addition to addressing the necessary repairs, reconstruction, and improvements to the

Town of Brunswick – Van Derheyden Dam Reconstruction and Improvements Read More »

Town of Highland Breaks Ground on Highway Department Garage

Construction of the Highway Department Garage for the Town of Highland is officially underway with the groundbreaking ceremony held the first week of August, 2018. Laberge Group was retained to provide architectural, structural, mechanical, and electrical design and engineering services. A series of meetings with the Highway Department and other interested stakeholders provided the basis

Town of Highland Breaks Ground on Highway Department Garage Read More »

Lake George Studies Feasibility of Consolidating Facilities

Like many municipalities throughout the State of New York, the Town and Village of Lake George, together with the Lake George Central School District, are seeking solutions that will allow them to maintain an affordable tax rate while continuing to deliver the level of services that contribute to the quality of life of their constituents.

Lake George Studies Feasibility of Consolidating Facilities Read More »

LaPierre Lane Riverway in Plattsburgh – The First Implementation of a Robust Waterfront Plan

The LaPierre Lane Riverway in the Town of Plattsburgh was designed to improve public access to the Saranac River and provide residents and visitors with the opportunity to relax, play, exercise, and learn in a scenic waterfront setting. These improvements are the first implementation of the Lake Champlain & Saranac River Waterfront Plan developed by Laberge

LaPierre Lane Riverway in Plattsburgh – The First Implementation of a Robust Waterfront Plan Read More »

MS4 Compliance – Working with the Town of Sand Lake to Protect Waterways

The Town of Sand Lake has taken the initiative to benefit their residents by proactively protecting the lakes and streams in their community from potential pollutants in stormwater runoff. The Town engaged Laberge Group to ensure compliance with Municipal Separate Storm Sewer Systems (MS4) requirements, which are designed to minimize pollutants in stormwater runoff that would

MS4 Compliance – Working with the Town of Sand Lake to Protect Waterways Read More »