Revitalizing a Waterfront – Town of Plattsburgh Laberge Group was retained to prepare the Lake Champlain/Saranac River Waterfront Plan for the Town of Plattsburgh. The
Mastic Beach Village Dissolution Laberge Group was retained by the Village of Mastic Beach to guide them through the village dissolution process. Dissolution is the
Sewer Pump Station Laberge Group provided planning, design and services during construction for the total rehabilitation of 30-year-old wastewater pumping station including pumps, controls, and
Village Wide Sewer System Evaluation This project involved the cleaning and video inspection of the storm sewer and sanitary sewer system. From the video inspection