Sewer Pump Station

Sewer Pump Station

Laberge Group provided planning, design and services during construction for the total rehabilitation of 30-year-old wastewater pumping station including pumps, controls, and emergency power; operation of this sewer pump station was maintained throughout the rehabilitation.  The project also included:

  • wet well improvements
  • pump and motor rehabilitation
  • curbs and sidewalks along the north side of the road
  • storm sewer modifications

Miscellaneous details include:

  • maintenance and protection of traffic plans
  • preparation of construction documents
  • engineer’s cost estimate
  • on-site construction observation
  • preparation of As-Built plans.