Engineering_ALL_07-2015

Village Wide Sewer System Evaluation

This project involved the cleaning and video inspection of the storm sewer and sanitary sewer system. From the video inspection determined – what if any – rehabilitation of the sewer system(s) was required. Laberge Group was  responsible for the preparation of contract documents, resident representation during the investigative rehabilitation phases, and the administrative close-out of the project.