Sewer Pump Station
Laberge Group provided planning, design and services during construction for the total rehabilitation of 30-year-old wastewater pumping station including pumps, controls, and emergency power; operation of this sewer pump station was maintained throughout the rehabilitation. The project also included:
- wet well improvements
- pump and motor rehabilitation
- curbs and sidewalks along the north side of the road
- storm sewer modifications
Miscellaneous details include:
- maintenance and protection of traffic plans
- preparation of construction documents
- engineer’s cost estimate
- on-site construction observation
- preparation of As-Built plans.