This project includes the planning and design of a new 6 vehicle bay Town Highway Garage Facility for the Town of Altona. Storing vehicles and equipment outdoors year after year can speed up the deterioration of a Town’s valuable assets. With budgetary constraints in mind, Laberge Group began the design with a pre-engineered steel building and modified it for the Town’s needs saving time and money. This six bay building includes a pull through repair bays with vehicle lift, a mechanical/electric room, office space, break room space, and a uni-sex restroom. A sloped concrete floor with floor drainage system was installed throughout. The buildings systems feature a zoned radiant heat system throughout, maximizing heat distribution and energy efficiency, ventilation air, restroom plumbing and floor drainage.
In building a state of the art Highway Garage the Town of Altona can protect, extend and improve the useful life of its fleet, improve the working conditions of its employees, and comply with the current stringent environmental and building standards of this building type.